RAPID CITY, S.D. – June 28, 2021 – Roadway excavation and culvert installation continue from Highway 385 to the westernmost Spring Creek bridge. Gravel placement is anticipated to begin late this month.
Storm sewer installation continues moving east from Victoria Lake Road. Roadway excavation and fill placement also continue along the new alignment from Old Sheridan Road moving west to Rockwood Lane. Gravel is being placed in preparation for curb and gutter.
A maintenance crew will be onsite during precipitation events and through the weekends to continue to maintain the road.
Traffic to The Marina at Sheridan Lake must use the gravel detour from Highway 385. The Marina is not accessible from Sheridan Lake Road during this construction season.
The speed limit is 35 mph from Norseman Lane to Rockwood Road. Sheridan Lake Road is fully closed from Spring Creek Trailhead Road to Highway 385. Thru traffic from Rapid City to Highway 385 must use an alternate route. Motorists are asked to be aware of suddenly slowing and merging traffic, changing work zone locations, reduced speeds through the work zone, and construction workers and equipment adjacent to the driving lanes.
Additional information will be provided as phasing, access, and traffic control changes with the progression of the project. To view the entire scope of the project, with the phasing and traffic control plans as well as weekly updates, please visit the project website https://www.SheridanLakeRoad.com or the ArcGIS StoryMap located at: https://arcg.is/58fn9. Interested persons can also follow the project on Facebook, “Sheridan Lake Road Reconstruction,” and on Twitter, “Sheridan Lake Road Reconstruction@FerbEng.” The public may leave a message at (605)343-3311 with any questions or concerns regarding this reconstruction project.

Photo by: Ron Rossknecht